The dam repairs at the Rideau Falls required unique staging, as the only access was from the Ottawa River. The repairs included concrete work on the wing walls.

The Sarsfield Road Culverts were large diameter corrugated steel pipes that had over two metres cover each, requiring the installation of slope retaining wingwalls to be incorporated in the project. Extensive dewatering was required for this project.

The Orleans Recreational Complex was a complete build project that incorporated the construction of an indoor swimming pool used for recreational swimming as well as lane swimming.

Dalcon had the opportunity to construct a very unique project in the RCMP Horse Exerciser. This gazebo-like structure is used to walk horses without the need of direct supervision. A unique aspect of this project was the carousel in the center with the arms outstretching to hitch the horse.